Stepford County Railway Wiki

The Stepford County Railway Wiki has announced a new revamp project, giving the community a new way to give feedback for the project's future. You can read more here and participate on our Discord server.

READ MORE

Stepford County Railway Wiki
Tag: Visual edit
No edit summary
Tag: Visual edit
(18 intermediate revisions by 8 users not shown)
Line 5: Line 5:
 
</gallery>
 
</gallery>
 
|stops: = 9
 
|stops: = 9
|minimum_price: = 2250 (or 1800 at 20% off)
+
|minimum_price: = 2250 points
 
|rolling_stock: = 2
 
|rolling_stock: = 2
 
|start_station: = [[Stepford Central]]
 
|start_station: = [[Stepford Central]]
Line 16: Line 16:
   
 
== Overview ==
 
== Overview ==
'''Stepford Express, '''commonly called '''Express''', is the fast rail link between major cities and zones such as [[Benton]], [[Leighton Zone|Leighton]], and [[Llyn-by-the-Sea]]. It currently has 2 trains and 4 routes. All 4 routes originate at Stepford Central.
+
'''Stepford Express, '''commonly called '''Express''', is the fast rail link between major cities and zones such as [[Benton]], [[Leighton Zone|Leighton]], and [[Llyn-by-the-Sea]]. It currently has 2 trains and 4 routes. All 4 routes originate at [[Stepford Central]].
   
 
== History ==
 
== History ==
   
 
=== '''2018''' ===
 
=== '''2018''' ===
First traces of Express could be seen as far back as January 7th, where a new express line was built. The works included new Platforms 5 & 6 at Benton, passing tracks through Coxly and Bodin, and Platforms 1&2 at the Pre-1.1 Stepford East abandoned, later removed. The works caused Connect to use a different route to Stepford Central via Angel Pass. Works also happened east of Benton, where a linking line from Benton to the fast lines near Hampton Hargate was built. Despite being built early on, the tracks wouldn't see an actual train until nearly two years later.
+
First traces of Express could be seen as far back as January 7th, where a new express line was built. The works included new Platforms 5 & 6 at Benton, passing tracks through [[Coxly]] and [[Bodin]], and Platforms 1 & 2 at the Pre-[[SCR Version 1.1|V1.1]] [[Stepford East]] abandoned, later removed. The works caused [[Connect]] to use a different route to [[Stepford Central]] via [[Angel Pass]]. Works also happened east of [[Benton]], where a linking line from [[Benton]] to the fast lines near [[Hampton Hargate]] was built.
  +
On December 22nd, 2018, BanTech mentioned that Express will NOT be coming in 1.1 as they prioritized [[AirLink]] and not Express, hinting that Express would be coming in future updates.
+
On December 22nd, 2018, BanTech mentioned that Express will NOT be coming in V1.1 as they prioritized [[AirLink]] and not Express, hinting that Express would be coming in future updates.
   
 
=== '''2019''' ===
 
=== '''2019''' ===
Line 29: Line 30:
 
Express wasn't mentioned again until the 22nd of September when BanTech announced that Connect Extension and Express Line were delayed.
 
Express wasn't mentioned again until the 22nd of September when BanTech announced that Connect Extension and Express Line were delayed.
   
On the 29th of September, Matty, then the OD, showed off [[Faymere]] and commented "This station will be served by Connect but is a cool place to watch Express trains pass at speed!". On the 5th of October, Charlie showed [[Northshore]] and commented "Fancy a wander on the beach? Connect and Express can help you out with that! Introducing Northshore". This confirmed to the public that Express was skipping [[Faymere]] yet stopping at [[Northshore]].
+
On the 29th of September, Matty, then the OD, showed off [[Faymere]] and commented "This station will be served by Connect but is a cool place to watch Express trains pass at speed!". On the 5th of October, Charlie showed [[Northshore]] and commented "Fancy a wander on the beach? [[Connect]] and Express can help you out with that! Introducing [[Northshore]]". This confirmed to the public that Express was skipping [[Faymere]] yet stopping at [[Northshore]].
   
 
On the 18th of October, Matty showed [[Llyn-by-the-Sea]] and a [[Class 43]] for Express which got the public hyped up again and confirmed Express was stopping at Llyn. Finally, on the 25th of November, BanTech showed a picture of the 43 at [[Stepford Central]].
 
On the 18th of October, Matty showed [[Llyn-by-the-Sea]] and a [[Class 43]] for Express which got the public hyped up again and confirmed Express was stopping at Llyn. Finally, on the 25th of November, BanTech showed a picture of the 43 at [[Stepford Central]].
Line 50: Line 51:
 
'''(Next-Gen)'''[[File:RobloxScreenShot20191219 194326530.png|left|thumb|152x152px]]
 
'''(Next-Gen)'''[[File:RobloxScreenShot20191219 194326530.png|left|thumb|152x152px]]
 
|125 MPH
 
|125 MPH
  +
|3000 points
|2400 (20% off)
 
 
|4 with 2 locomotives, making it 6 cars
 
|4 with 2 locomotives, making it 6 cars
 
|All routes
 
|All routes
Line 60: Line 61:
 
'''(Next-Gen)'''[[File:RobloxScreenShot20191219 155631359.png|left|thumb|152x152px]]
 
'''(Next-Gen)'''[[File:RobloxScreenShot20191219 155631359.png|left|thumb|152x152px]]
 
|125 MPH
 
|125 MPH
  +
|2250 points
|1800 (20% off)
 
 
|5 cars
 
|5 cars
 
|All routes
 
|All routes
|Hitachi/A-Train
+
|''Hitachi/A-Train AT300''
 
|December 17th 2019
 
|December 17th 2019
 
|}
 
|}
Line 90: Line 91:
 
=== Current ===
 
=== Current ===
 
* [[Stepford Central]]
 
* [[Stepford Central]]
* [[St Helen's Bridge]]
+
* [[St Helen's Bridge|St Helens Bridge]]
 
* [[Benton]]
 
* [[Benton]]
 
* [[Leighton Stepford Road]]
 
* [[Leighton Stepford Road]]
Line 107: Line 108:
 
== Trivia ==
 
== Trivia ==
 
* Matty's sneak peek of [[Starryloch]] showed a fragment of a purple-coloured train, which aroused speculation that it could be an Express train. It was later revealed to be the [[Class 43]] alongside the long-waited [[Llyn-by-the-Sea]] sneak peek.
 
* Matty's sneak peek of [[Starryloch]] showed a fragment of a purple-coloured train, which aroused speculation that it could be an Express train. It was later revealed to be the [[Class 43]] alongside the long-waited [[Llyn-by-the-Sea]] sneak peek.
* A significant portion of the tracks have been or are already in use. Before [[Angel Pass]] was added, [[Stepford Connect|Connect]] trains used the express tracks between [[St Helens Bridge]] and [[Bodin]]. Also, [[Airlink|AirLink]] trains used the Express tracks between just west of [[Hampton Hargate]] to [[Leighton Stepford Road]] since the five million visits update.
+
* A significant portion of the tracks have been or are already in use. Before [[Angel Pass]] was added, [[Stepford Connect|Connect]] trains used the express tracks between [[St Helens Bridge]] and [[Bodin]], and the middle tracks between [[Coxly]] and [[Benton]]. Platforms 1-3 at Stepford Town ([[Stepford Central]]) and Platforms 1-2 at [[St Helen's Bridge|St Helens Bridge]] were formerly operated by [[Connect]]. Also, [[Airlink|AirLink]] trains used the Express tracks between just west of [[Hampton Hargate]] to [[Leighton Stepford Road]] since the [[Five Million Update]].
* The [[Class 43]] holds the record for the longest train in SCR along with the double [[AirLink]] [[Class 185]].
+
* The [[Class 43]] holds the record for the longest train in SCR along with the Double [[AirLink]] [[Class 185]].
 
* The [[Class 801]] is exactly the same as the [[Class 802]] running on [[AirLink]], with the exception of class numbers, liveries, operators, and maximum speeds.
 
* The [[Class 801]] is exactly the same as the [[Class 802]] running on [[AirLink]], with the exception of class numbers, liveries, operators, and maximum speeds.
 
* This is the 2nd operator to feature "[https://scr.fandom.com/wiki/Category:A-Train bullet trains]" as the first was [[AirLink]].
 
* This is the 2nd operator to feature "[https://scr.fandom.com/wiki/Category:A-Train bullet trains]" as the first was [[AirLink]].
 
* Every Express route plays the "The Train now approaching Platform x, does not stop here. Please stand back from the Platform edge." message while passing at least 1 station.
 
* Every Express route plays the "The Train now approaching Platform x, does not stop here. Please stand back from the Platform edge." message while passing at least 1 station.
 
* Stepford Express serves the least amount of stations of any operator on the network, at 9 stations.
 
* Stepford Express serves the least amount of stations of any operator on the network, at 9 stations.
  +
* [[Stepford Connect]] stops at every one of the 9 stations that Stepford Express stops at. 4 of those 9 have [[Connect]] and Express share Platforms ([[Leighton Stepford Road]], [[Leighton City]], [[Edgemead]], and [[Llyn-by-the-Sea]]). Stepford Express services is a part of [[Stepford Connect]], the other operator is [[WaterLine]].
  +
* The headquarters of this operator cannot be found.
  +
* A Class 91 was actually supposed to run on the line, evident in a showcase of future SCR trains made by former [[Product Developer|PDV]], OverheadWires, but due to his resignation the units were never completed and were never put into service. It's unknown if someone else would finish them and put them in service.
 
[[Category:Operators]]
 
[[Category:Operators]]

Revision as of 19:59, 25 January 2020

Template:Line

Overview

Stepford Express, commonly called Express, is the fast rail link between major cities and zones such as Benton, Leighton, and Llyn-by-the-Sea. It currently has 2 trains and 4 routes. All 4 routes originate at Stepford Central.

History

2018

First traces of Express could be seen as far back as January 7th, where a new express line was built. The works included new Platforms 5 & 6 at Benton, passing tracks through Coxly and Bodin, and Platforms 1 & 2 at the Pre-V1.1 Stepford East abandoned, later removed. The works caused Connect to use a different route to Stepford Central via Angel Pass. Works also happened east of Benton, where a linking line from Benton to the fast lines near Hampton Hargate was built.

On December 22nd, 2018, BanTech mentioned that Express will NOT be coming in V1.1 as they prioritized AirLink and not Express, hinting that Express would be coming in future updates.

2019

On May 11th, 2019, BanTech unveiled the roadmap. Under Q3 of 2019, it mentioned the Express line, which got people hyped because they would be getting Express over the summer.

Express wasn't mentioned again until the 22nd of September when BanTech announced that Connect Extension and Express Line were delayed.

On the 29th of September, Matty, then the OD, showed off Faymere and commented "This station will be served by Connect but is a cool place to watch Express trains pass at speed!". On the 5th of October, Charlie showed Northshore and commented "Fancy a wander on the beach? Connect and Express can help you out with that! Introducing Northshore". This confirmed to the public that Express was skipping Faymere yet stopping at Northshore.

On the 18th of October, Matty showed Llyn-by-the-Sea and a Class 43 for Express which got the public hyped up again and confirmed Express was stopping at Llyn. Finally, on the 25th of November, BanTech showed a picture of the 43 at Stepford Central.

On the 17th of December, 2019, 1.4 came out with Express, 4 new routes, and 2 new trains.

Rolling Stock

Current Fleet

Class Number Maximum Speed Price Number of Coaches Routes Operated On Train Family/Manufacturer Date Put Into Service
Class 43 (Next-Gen)
RobloxScreenShot20191219 194326530
125 MPH 3000 points 4 with 2 locomotives, making it 6 cars All routes

British Rail Engineering Limited/InterCity 125

December 17th 2019
Class 801 (Next-Gen)
RobloxScreenShot20191219 155631359
125 MPH 2250 points 5 cars All routes Hitachi/A-Train AT300 December 17th 2019

Former

  • None at the moment

Future

  • None at the moment

Depots

Current

Former

  • None at the moment

Future

  • None at the moment

 Stations

Current

Former

  • None at the moment

Future

  • None at the moment

Trivia

  • Matty's sneak peek of Starryloch showed a fragment of a purple-coloured train, which aroused speculation that it could be an Express train. It was later revealed to be the Class 43 alongside the long-waited Llyn-by-the-Sea sneak peek.
  • A significant portion of the tracks have been or are already in use. Before Angel Pass was added, Connect trains used the express tracks between St Helens Bridge and Bodin, and the middle tracks between Coxly and Benton. Platforms 1-3 at Stepford Town (Stepford Central) and Platforms 1-2 at St Helens Bridge were formerly operated by Connect. Also, AirLink trains used the Express tracks between just west of Hampton Hargate to Leighton Stepford Road since the Five Million Update.
  • The Class 43 holds the record for the longest train in SCR along with the Double AirLink Class 185.
  • The Class 801 is exactly the same as the Class 802 running on AirLink, with the exception of class numbers, liveries, operators, and maximum speeds.
  • This is the 2nd operator to feature "bullet trains" as the first was AirLink.
  • Every Express route plays the "The Train now approaching Platform x, does not stop here. Please stand back from the Platform edge." message while passing at least 1 station.
  • Stepford Express serves the least amount of stations of any operator on the network, at 9 stations.
  • Stepford Connect stops at every one of the 9 stations that Stepford Express stops at. 4 of those 9 have Connect and Express share Platforms (Leighton Stepford Road, Leighton City, Edgemead, and Llyn-by-the-Sea). Stepford Express services is a part of Stepford Connect, the other operator is WaterLine.
  • The headquarters of this operator cannot be found.
  • A Class 91 was actually supposed to run on the line, evident in a showcase of future SCR trains made by former PDV, OverheadWires, but due to his resignation the units were never completed and were never put into service. It's unknown if someone else would finish them and put them in service.