Stepford County Railway Wiki

The Stepford County Railway Wiki has announced a new revamp project, giving the community a new way to give feedback for the project's future. You can read more here and participate on our Discord server.

READ MORE

Stepford County Railway Wiki
(Tweaks to the rolling stock chart, operator description and history. It's all the same, just with slightly more appropriate phrasing.)
Tag: Visual edit
mNo edit summary
Tag: Visual edit
(40 intermediate revisions by 9 users not shown)
Line 10: Line 10:
 
|minimum_price: = Free
 
|minimum_price: = Free
 
|start_station: = [[Stepford Victoria]]
 
|start_station: = [[Stepford Victoria]]
  +
 
[[Stepford Central]]
 
[[Stepford Central]]
   
 
[[St Helen's Bridge]]
 
[[St Helen's Bridge]]
|end_station: = [[Airport Central]]
+
|end_station: = [[Stepford Airport Central]]
   
 
[[Port Benton]]
 
[[Port Benton]]
Line 33: Line 34:
 
[[Llyn-by-the-Sea]]
 
[[Llyn-by-the-Sea]]
 
}}
 
}}
  +
 
== Overview ==
 
== Overview ==
'''Stepford Connect '''is the brand name used for regional services from Stepford City to Benton, Leighton and further regions, and Stepford Airport.
+
'''Stepford Connect '''is the brand name used for regional services from [[Stepford City Zone|Stepford City]] to [[Benton]], [[Airport Zone|Stepford Airport]], [[Leighton Zone|Leighton]], and beyond.
   
Its headquarters is located between [[Stepford East]] and [[Stepford Central]].
+
The [[Stepford Connect Headquarters]] is located between [[Stepford East]] and [[Stepford Central]].
   
'''WaterLine '''shares Connect's likeness as a sub-brand.
+
'''[[WaterLine]] '''is a sub-brand of Connect and shares its branding likeness, including the use of the phrase "Part of your Connect service."
   
== History of Stepford Connect ==
+
== History ==
   
 
=== '''2017''' ===
 
=== '''2017''' ===
Stepford Connect was the first brand for SCR, beginning service on November 25th 2017, with the [[Class 700]] as its sole rolling stock. Services began between Stepford Town (later renamed [[Stepford Central]]) and [[Benton]], then were later extended to [[Stepford Airport Central]], providing a direct link between the city and the airport. Around the same time [[Port Benton]] opened, which was the first non-mainline station on the network. The station was also the first to feature a terminus loop. Later, the new [[Coxly Depot]] was opened to alleviate traffic from the overcrowded [[Benton Depot]], along with the addition of [[Class 333]] units to further improve the frequency of services. The addition of [[Class 321]] units followed shortly after on the 29th, and so did the opening of the mainline to [[Winstree]] (spiritual successor [[Leighton Stepford Road]]). Around December, [[Bodin]], [[Benton Bridge]], [[Stepford Airport Parkway]] and [[Stepford Airport Central]] were renovated for larger capacity. A renovation to [[Benton]] followed shortly after. On December 4th, [[Class 357]] and [[Class 387]] units entered service, being the first Electrostar units to ever operate on the network. [[Class 350]]s entered service shortly after on December 6. On December 11th, some Class 700s were fitted with a special livery to celebrate Christmas and the [[Class 185]]s entered service on the 13th. On the 21st, the Class 387 units were taken out of service in favor of [[Class 377]] units.
+
Stepford Connect was the first operator for SCR, beginning service on November 25th 2017, with the [[Class 700]] as its sole rolling stock. Services began between Stepford Town (later renamed [[Stepford Central]]) and [[Benton]], then were later extended to [[Stepford Airport Central]], providing a direct link between the city and the airport. Around the same time [[Port Benton]] opened, which was the first non-mainline station on the network. The station was also the first to feature a terminus loop. Later, the new [[Coxly Depot]] was opened to alleviate traffic from the overcrowded [[Benton Depot]], along with the addition of [[Class 333]] units to further improve the frequency of services. The addition of [[Class 321]] units followed shortly after on the 29th, and so did the opening of the mainline to [[Winstree]] (spiritual successor [[Leighton Stepford Road]]). Around December, [[Bodin]], [[Benton Bridge]], [[Stepford Airport Parkway]], and [[Stepford Airport Central]] were renovated for larger capacity. A renovation to [[Benton]] followed shortly after. On December 4th, [[Class 357]] and [[Class 387]] units entered service, being the first Electrostar units to ever operate on the network. [[Class 350]]s entered service shortly after on December 6. On December 11th, some [[Class 700]]s were fitted with a special livery to celebrate Christmas and the [[Class 185]]s entered service on the 13th. On the 18th, the [[Class 387]] units were taken out of service in favor of [[Class 377]] units.
   
 
=== '''2018''' ===
 
=== '''2018''' ===
New trains entered service at the stroke of midnight on January 1st: the [[Class 170]]s. The [[Class 720]]s followed, being the first Aventra trains on the network. Benton got another renovation on January 9th to its present-day look. On April 21st, SCR got a complete revamp with [[The Big Update|V1.0]], which had a major impact on Stepford Connect, including the scrapping of the [[Class 700]] units, which were replaced by the [[Class 707]]s, and many station renovations or replacements, such as [[Leighton Stepford Road]] which replaced Winstree, and other stations such as [[Rocket Parade]] opened. On August 4th, the [[Class 365]] trains were officially proposed to enter service on Stepford Connect. On December 31st, extensions to [[Morganstown]] and [[Edgemead]] were opened, and [[Class 68|Class 68s]] hauling Mark 3 coaches were introduced to service.
+
New trains entered service at the stroke of midnight on January 1st: the [[Class 170]]s. The [[Class 720]]s followed, being the first Aventra trains on the network. [[Benton]] got another renovation on January 9th to its present-day look. On April 21st, SCR got a complete revamp with [[The Big Update|V1.0]], which had a major impact on Stepford Connect, including the scrapping of the [[Class 700]] units, which were replaced by the [[Class 707]]s, and many station renovations or replacements, such as [[Leighton Stepford Road]] which replaced [[Winstree]], and other stations such as [[Rocket Parade]] opened. On August 4th, the [[Class 365]] trains were officially proposed to enter service on Stepford Connect. On December 31st, extensions to [[Morganstown]] and [[Edgemead]] were opened, and [[Class 68]]s hauling Mark 3 coaches were introduced to service.
   
 
=== '''2019''' ===
 
=== '''2019''' ===
On April 28th, the extension to [[Whitefield]] opened to much success. On May 6th, the [[Class 331]]s were introduced. On May 14th, the [[Class 158]]s entered service, the first [[Next Generation]] trains for Stepford Connect. On May 29th, the [[Class 185]]s were upgraded, and on June 8, the [[Class 377]]s were upgraded. On July 5, the [[Class 350]]s and [[Class 357|357s]] received their upgrades. On July 9, [[Class 458/5]]s were introduced. The [[Class 68]]s were then upgraded on August 7th. On August 14th, Class 458/0s were put into service. On August 31, the [[Class 170]]s were upgraded. On September 22nd, a sneak-peek from SCR's official Discord server confirmed [[Westercoast]] as one of the stations on an upcoming extension. More new stations were revealed over time, namely [[Faymere]] and [[Northshore]]. A fourth station, [[Starryloch]], was revealed on October 16th. The terminus of the extension was revealed on October 18th - [[Llyn-by-the-Sea]]. The extension was opened on December 17 as part of [[SCR Version 1.4|Version 1.4]].
+
On April 28th, the extension to [[Whitefield]] opened to much success. On May 6th, the [[Class 331]]s were introduced. On May 14th, the [[Class 158]]s entered service, the first [[Next Generation]] trains for Stepford Connect. On May 29th, the [[Class 185]]s were upgraded, and on June 8, the [[Class 377]]s were upgraded. On July 5, the [[Class 350]]s and [[Class 357|357s]] received their upgrades. On July 9, [[Class 458|Class 458/5s]] were introduced. The [[Class 68]]s were then upgraded on August 7th. On August 14th, [[Class 458|Class 458/0s]] were put into service. On August 31, the [[Class 170]]s were upgraded. On December 17, Connect was extended to [[Llyn-by-the-Sea|Llyn-by-the-sea]] as part of [[SCR Version 1.4|Version 1.4]], with three new routes.
  +
  +
=== '''2020''' ===
  +
On February 22, the [[Class 321]], [[Class 331]], [[Class 465]], and [[Class 720]] got upgraded to [[Next Generation]], [[Faymere Green TMD]] depot added, [[Stepford Central]], [[Stepford High Street]], [[Whitefield]], and [[Benton]] got upgraded.
   
 
== Rolling Stock ==
 
== Rolling Stock ==
Line 59: Line 64:
 
!Number of Coaches
 
!Number of Coaches
 
!Routes Operated On
 
!Routes Operated On
!'''Manufacturer'''''Train Family''
+
!Manufacturer/Train Family
 
!Date Put Into Service
 
!Date Put Into Service
 
|-
 
|-
 
|[[Class 158|'''Class 158''']]
 
|[[Class 158|'''Class 158''']]
 
'''(Next-Gen)'''
 
'''(Next-Gen)'''
[[File:158 158911.png|left|thumb|136x136px]]
+
[[File:Class 158 @ Rocket Parade.png|left|thumb|136x136px]]
 
|90 MPH
 
|90 MPH
 
|1500 Points
 
|1500 Points
 
|2 or 3 coaches
 
|2 or 3 coaches
 
|All routes excluding [[R009]] and [[R026]]
 
|All routes excluding [[R009]] and [[R026]]
  +
|British Rail Engineering Limited/Sprinter
|BREL
 
''Sprinter''
 
 
|May 14, 2019
 
|May 14, 2019
 
|-
 
|-
 
|[[Class 170|'''Class 170''']]
 
|[[Class 170|'''Class 170''']]
'''(Next-Gen)'''[[File:RobloxScreenShot20190902_142152243_(2).png|thumb|left|136px]]
+
'''(Next-Gen)'''[[File:Class 170 @ Llyn-by-the-Sea.png|thumb|left|136px]]
 
|100 MPH
 
|100 MPH
 
|1500 Points
 
|1500 Points
 
|3 coaches
 
|3 coaches
 
|All routes excluding [[R009]] and [[R026]]
 
|All routes excluding [[R009]] and [[R026]]
|Bombardier, Adtranz
+
|Adtranz/Bombardier Transportation/Turbostar
''Turbostar''
 
 
|January 1, 2018 (Next Generation- August 31, 2019)
 
|January 1, 2018 (Next Generation- August 31, 2019)
 
|-
 
|-
Line 89: Line 92:
 
|3 Coaches
 
|3 Coaches
 
|All routes excluding [[R009]] and [[R026]]
 
|All routes excluding [[R009]] and [[R026]]
|Siemens
+
|Siemens Mobility/Desiro
''Desiro''
 
 
|December 13, 2017
 
|December 13, 2017
 
(Next Generation- May 29, 2019)
 
(Next Generation- May 29, 2019)
 
|-
 
|-
|[[Class 321|'''Class 321''']]''' (Soon Next-Gen)'''[[File:321-0.PNG|thumb|left|136px]]
+
|[[Class 321|'''Class 321''']]
 
'''(Next-Gen)'''[[File:321381.png|thumb|left|136px]]
 
|100 MPH
 
|100 MPH
 
|1500 Points
 
|1500 Points
 
|4 coaches
 
|4 coaches
 
|All routes excluding [[R009]] and [[R026]]
 
|All routes excluding [[R009]] and [[R026]]
  +
|British Rail Engineering Limited/BR Second Generation (Mark 3)
|BREL
 
''Mark 3''
 
 
|November 29, 2017
 
|November 29, 2017
  +
(Next Generation- February 22, 2020)
 
|-
 
|-
|[[Class 331|'''Class 331''']]'' '''(Soon Next-Gen)'''''
+
|[[Class 331|'''Class 331''']]
  +
'''''(Next-Gen)'''''
[[File:331108.png|thumb|left|136px]]
 
  +
[[File:NG 331149.png|thumb|left|136px]]
 
|100 MPH
 
|100 MPH
 
|1500 Points
 
|1500 Points
 
|3 or 4 coaches
 
|3 or 4 coaches
 
|All routes excluding [[R009]] and [[R026]]
 
|All routes excluding [[R009]] and [[R026]]
|CAF
+
|CAF/Civity
''Civity''
 
 
|May 6, 2019
 
|May 6, 2019
  +
(Next Generation- February 22, 2020)
 
|-
 
|-
 
|'''[[Class 333]]'''
 
|'''[[Class 333]]'''
Line 120: Line 124:
 
|All routes excluding [[R009]] and [[R026]]
 
|All routes excluding [[R009]] and [[R026]]
 
|
 
|
Siemens Mobility, CAF
+
Siemens Mobility and CAF
 
|November 30, 2017
 
|November 30, 2017
 
|-
 
|-
Line 129: Line 133:
 
|4 coaches
 
|4 coaches
 
|All routes excluding [[R009]] and [[R026]]
 
|All routes excluding [[R009]] and [[R026]]
|Siemens
+
|Siemens Mobility/Desiro
''Desiro''
 
 
|December 6, 2017 (Next Generation-July 5, 2019)
 
|December 6, 2017 (Next Generation-July 5, 2019)
 
|-
 
|-
Line 139: Line 142:
 
|4 coaches
 
|4 coaches
 
|All routes excluding [[R009]] and [[R026]]
 
|All routes excluding [[R009]] and [[R026]]
|Bombardier, Adtranz ''Electrostar''
+
|Adtranz/Bombardier Transportation/Electrostar
 
|December 4, 2017 (Next Generation-July 5, 2019)
 
|December 4, 2017 (Next Generation-July 5, 2019)
 
|-
 
|-
Line 148: Line 151:
 
|4 coaches
 
|4 coaches
 
|All routes excluding [[R009]] and [[R026]]
 
|All routes excluding [[R009]] and [[R026]]
|Bombardier
+
|Bombardier Transportation/Electrostar
''Electrostar''
 
 
|December 18, 2017 (Next Generation- June 8, 2019)
 
|December 18, 2017 (Next Generation- June 8, 2019)
 
|-
 
|-
Line 158: Line 160:
 
|3 or 4 coaches
 
|3 or 4 coaches
 
|All routes excluding [[R009]] and [[R026]]
 
|All routes excluding [[R009]] and [[R026]]
|Siemens
+
|Siemens Mobility/Desiro
''Desiro''
 
 
|May 11, 2018
 
|May 11, 2018
 
|-
 
|-
Line 170: Line 171:
 
4 or 5 coaches
 
4 or 5 coaches
 
|All routes excluding [[R009]] and [[R026]]
 
|All routes excluding [[R009]] and [[R026]]
|Alstom
+
|Alstom/Juniper
''Juniper''
 
 
|
 
|
 
/5 - July 29, 2019
 
/5 - July 29, 2019
Line 177: Line 177:
 
/0 - August 14, 2019
 
/0 - August 14, 2019
 
|-
 
|-
|[[Class 465|'''Class 465''']]'' '''(Soon Next-Gen)'''''
+
|[[Class 465|'''Class 465''']]
  +
'''''(Next-Gen)'''''
[[File:Class465.png|left|thumb|136x136px]]
+
[[File:465PB.PNG|left|thumb|136x136px]]
 
|75 MPH
 
|75 MPH
 
|1500 Points
 
|1500 Points
 
|4 coaches
 
|4 coaches
 
|All routes excluding [[R009]] and [[R026]]
 
|All routes excluding [[R009]] and [[R026]]
|BREL, ABB, Metro-Cammel
+
|British Rail Engineering Limited, ABB Rail, Metro-Cammell/Networker
''Networker''
 
 
|November 30, 2017
 
|November 30, 2017
  +
(Next Generation- February 22, 2020)
 
|-
 
|-
 
|'''[[Class 707]] (Next-Gen)'''
 
|'''[[Class 707]] (Next-Gen)'''
[[File:707042.png|thumb|left|136px]]
+
[[File:707058 at Benton.png|thumb|left|136px]]
 
|100 MPH
 
|100 MPH
 
|300 Points
 
|300 Points
 
|5 coaches
 
|5 coaches
 
|All routes excluding [[R009]] and [[R026]]
 
|All routes excluding [[R009]] and [[R026]]
|Siemens
+
|Siemens/Desiro City
''Desiro City''
 
 
|April 21, 2018 (Next Generation- July 20, 2019)
 
|April 21, 2018 (Next Generation- July 20, 2019)
 
|-
 
|-
|'''[[Class 720]] (Soon Next-Gen)'''
+
|'''[[Class 720]] (Next-Gen)'''
[[File:720_connect.png|thumb|left|136px]]
+
[[File:720036.png|thumb|left|136px]]
 
|100 MPH
 
|100 MPH
 
|1500 Points
 
|1500 Points
 
|5 coaches
 
|5 coaches
 
|All routes excluding [[R009]] and [[R026]]
 
|All routes excluding [[R009]] and [[R026]]
|Bombardier'' Aventra''
+
|Bombardier Transportation/Aventra
 
|January 29, 2018
 
|January 29, 2018
  +
(Next Generation- February 22, 2020)
 
|-
 
|-
 
|'''[[Class 68]] (Next-Gen)'''
 
|'''[[Class 68]] (Next-Gen)'''
[[File:68edge.png|thumb|left|136px]]
+
[[File:68.png|thumb|left|136px]]
 
|100 MPH
 
|100 MPH
 
|300
 
|300
Line 217: Line 218:
 
|[[R003]], [[R004]],
 
|[[R003]], [[R004]],
 
[[R006]], [[R007]], [[R009]], [[R022]], [[R024]], [[R025]], [[R026]]
 
[[R006]], [[R007]], [[R009]], [[R022]], [[R024]], [[R025]], [[R026]]
|Vossloh, Stadler
+
|Vossloh Eurolight
 
|December 31, 2018 (Next Generation- August 8th, 2019)
''Eurolight''
 
|December 31, 2018 (Next Generation-August 8th 2019)
 
 
|}
 
|}
   
Line 240: Line 240:
 
|6 coaches
 
|6 coaches
 
|Stepford Town ([[Stepford Central]])-[[Port Benton]]
 
|Stepford Town ([[Stepford Central]])-[[Port Benton]]
|Siemens
+
|Siemens Mobility/Desiro City
''Desiro City''
 
 
|November 25, 2017
 
|November 25, 2017
 
|April 21, 2018
 
|April 21, 2018
Line 253: Line 252:
 
|4 coaches
 
|4 coaches
 
|All routes
 
|All routes
|Bombardier ''Electrostar''
+
|Bombardier Transportation/Electrostar
 
|December 4, 2017
 
|December 4, 2017
 
|December 18, 2017 (Moved to [[Waterline]] on December 21, 2017, then [[AirLink]] on June 8, 2019)
 
|December 18, 2017 (Moved to [[Waterline]] on December 21, 2017, then [[AirLink]] on June 8, 2019)
 
|}
 
|}
   
=== Future ===
+
=== Future ===
  +
* None at the moment
{| class="article-table"
 
!Class Number
 
!Maximum Speed
 
!Price
 
!Number of Coaches
 
!Routes Operated On
 
!Manufacturer
 
''Train Family''
 
!Date Put Into Service
 
!Date Withdrawn From Service
 
|-
 
|'''[[Class 365]]'''[[File:Class365.png|left|thumb|155x155px]]
 
|100 MPH
 
|Unknown
 
|4 coaches
 
|Unknown
 
|ABB
 
''Networker''
 
|Unknown
 
|Unknown
 
|-
 
|}
 
   
 
== Depots ==
 
== Depots ==
Line 292: Line 270:
 
* [https://stepfordcountyrailway.fandom.com/wiki/Woodhead_Lane_Southbound_Depot Woodhead Lane SB Depot]
 
* [https://stepfordcountyrailway.fandom.com/wiki/Woodhead_Lane_Southbound_Depot Woodhead Lane SB Depot]
 
* [[Northshore Depot]]
 
* [[Northshore Depot]]
 
* [[Faymere Green TMD (Northbound)]]
  +
* [[Faymere Green TMD (Southbound)]]
   
 
=== Former ===
 
=== Former ===
Line 298: Line 278:
   
 
=== Future ===
 
=== Future ===
  +
* None at this time.
* [[Faymere Green TMD]]
 
   
 
== Sidings ==
 
== Sidings ==
Line 320: Line 300:
 
* [[Houghton Rake]]
 
* [[Houghton Rake]]
 
* [[Whitefield]]
 
* [[Whitefield]]
* [https://scr.fandom.com/wiki/St_Helen%27s_Bridge St Helens Bridge]
+
* [[St Helen's Bridge|St Helens Bridge]]
 
* [[New Harrow]]
 
* [[New Harrow]]
 
* [[Elsemere Pond]]
 
* [[Elsemere Pond]]
Line 355: Line 335:
   
 
=== Future ===
 
=== Future ===
None at this time.
+
* None at this time.
   
  +
== Trivia ==
  +
* This operator has the most fleet and stations.
  +
* This is the only operator in SCR that no trains can run on all routes.
  +
* Most of the stations were originally meant to be on the closed operator: Metro.
  +
* This is the oldest operator in SCR.
  +
* Only two trains are Paper Trains: the Class 333 and the Class 380.
  +
* This Operator haves the most Depots and Spawning Locations.
 
== Routes ==
 
== Routes ==
 
Click [[Routes|here]]
It takes up a whole page over here, so a page has been created for it.
 
 
Click [[Routes|here]] to go to the routes page.
 
 
[[Category:Operators]]
 
[[Category:Operators]]
|}
 

Revision as of 16:30, 26 February 2020

Template:Line

Overview

Stepford Connect is the brand name used for regional services from Stepford City to Benton, Stepford Airport, Leighton, and beyond.

The Stepford Connect Headquarters is located between Stepford East and Stepford Central.

WaterLine is a sub-brand of Connect and shares its branding likeness, including the use of the phrase "Part of your Connect service."

History

2017

Stepford Connect was the first operator for SCR, beginning service on November 25th 2017, with the Class 700 as its sole rolling stock. Services began between Stepford Town (later renamed Stepford Central) and Benton, then were later extended to Stepford Airport Central, providing a direct link between the city and the airport. Around the same time Port Benton opened, which was the first non-mainline station on the network. The station was also the first to feature a terminus loop. Later, the new Coxly Depot was opened to alleviate traffic from the overcrowded Benton Depot, along with the addition of Class 333 units to further improve the frequency of services. The addition of Class 321 units followed shortly after on the 29th, and so did the opening of the mainline to Winstree (spiritual successor Leighton Stepford Road). Around December, BodinBenton BridgeStepford Airport Parkway, and Stepford Airport Central were renovated for larger capacity. A renovation to Benton followed shortly after. On December 4th, Class 357 and Class 387 units entered service, being the first Electrostar units to ever operate on the network. Class 350s entered service shortly after on December 6. On December 11th, some Class 700s were fitted with a special livery to celebrate Christmas and the Class 185s entered service on the 13th. On the 18th, the Class 387 units were taken out of service in favor of Class 377 units.

2018

New trains entered service at the stroke of midnight on January 1st: the Class 170s. The Class 720s followed, being the first Aventra trains on the network. Benton got another renovation on January 9th to its present-day look. On April 21st, SCR got a complete revamp with V1.0, which had a major impact on Stepford Connect, including the scrapping of the Class 700 units, which were replaced by the Class 707s, and many station renovations or replacements, such as Leighton Stepford Road which replaced Winstree, and other stations such as Rocket Parade opened. On August 4th, the Class 365 trains were officially proposed to enter service on Stepford Connect. On December 31st, extensions to Morganstown and Edgemead were opened, and Class 68s hauling Mark 3 coaches were introduced to service.

2019

On April 28th, the extension to Whitefield opened to much success. On May 6th, the Class 331s were introduced. On May 14th, the Class 158s entered service, the first Next Generation trains for Stepford Connect. On May 29th, the Class 185s were upgraded, and on June 8, the Class 377s were upgraded. On July 5, the Class 350s and 357s received their upgrades. On July 9, Class 458/5s were introduced. The Class 68s were then upgraded on August 7th. On August 14th, Class 458/0s were put into service. On August 31, the Class 170s were upgraded. On December 17, Connect was extended to Llyn-by-the-sea as part of Version 1.4, with three new routes.

2020

On February 22, the Class 321, Class 331, Class 465, and Class 720 got upgraded to Next Generation, Faymere Green TMD depot added, Stepford Central, Stepford High Street, Whitefield, and Benton got upgraded.

Rolling Stock

Current

Class Number Maximum Speed Price Number of Coaches Routes Operated On Manufacturer/Train Family Date Put Into Service
Class 158

(Next-Gen)

Class 158 @ Rocket Parade
90 MPH 1500 Points 2 or 3 coaches All routes excluding R009 and R026 British Rail Engineering Limited/Sprinter May 14, 2019
Class 170 (Next-Gen)
Class 170 @ Llyn-by-the-Sea
100 MPH 1500 Points 3 coaches All routes excluding R009 and R026 Adtranz/Bombardier Transportation/Turbostar January 1, 2018 (Next Generation- August 31, 2019)
Class 185 (Next-Gen)
185Edge
100 MPH 1500 Points 3 Coaches All routes excluding R009 and R026 Siemens Mobility/Desiro December 13, 2017

(Next Generation- May 29, 2019)

Class 321 (Next-Gen)
321381
100 MPH 1500 Points 4 coaches All routes excluding R009 and R026 British Rail Engineering Limited/BR Second Generation (Mark 3) November 29, 2017

(Next Generation- February 22, 2020)

Class 331

(Next-Gen)

NG 331149
100 MPH 1500 Points 3 or 4 coaches All routes excluding R009 and R026 CAF/Civity May 6, 2019

(Next Generation- February 22, 2020)

Class 333
333 Connect
100 MPH 1500 Points 4 coaches All routes excluding R009 and R026

Siemens Mobility and CAF

November 30, 2017
Class 350 (Next-Gen)
350361
110 MPH 1500 Points 4 coaches All routes excluding R009 and R026 Siemens Mobility/Desiro December 6, 2017 (Next Generation-July 5, 2019)
Class 357 (Next-Gen)
357066
100 MPH Free 4 coaches All routes excluding R009 and R026 Adtranz/Bombardier Transportation/Electrostar December 4, 2017 (Next Generation-July 5, 2019)
Class 377 (Next-Gen)
377280
100 MPH 1500 Points 4 coaches All routes excluding R009 and R026 Bombardier Transportation/Electrostar December 18, 2017 (Next Generation- June 8, 2019)
Class 380
Roblox 12 19 2018 10 46 36 PM
100 MPH 1500 Points 3 or 4 coaches All routes excluding R009 and R026 Siemens Mobility/Desiro May 11, 2018
Class 458 (Next-Gen)
Class 458s
/5 - 75MPH

/0- 100MPH

1500 Points

4 or 5 coaches

All routes excluding R009 and R026 Alstom/Juniper

/5 - July 29, 2019

/0 - August 14, 2019

Class 465

(Next-Gen)

465PB
75 MPH 1500 Points 4 coaches All routes excluding R009 and R026 British Rail Engineering Limited, ABB Rail, Metro-Cammell/Networker November 30, 2017

(Next Generation- February 22, 2020)

Class 707 (Next-Gen)
707058 at Benton
100 MPH 300 Points 5 coaches All routes excluding R009 and R026 Siemens/Desiro City April 21, 2018 (Next Generation- July 20, 2019)
Class 720 (Next-Gen)
720036
100 MPH 1500 Points 5 coaches All routes excluding R009 and R026 Bombardier Transportation/Aventra January 29, 2018

(Next Generation- February 22, 2020)

Class 68 (Next-Gen)
68
100 MPH 300

Points

and 200 Experience

2 locomotives, 3 coaches, making it 5 coaches R003, R004,

R006, R007, R009, R022, R024, R025, R026

Vossloh Eurolight December 31, 2018 (Next Generation- August 8th, 2019)

Former

Class Number Maximum Speed Price Number of Coaches Routes Operated On Manufacturer

Train Family

Date Put Into Service Date Withdrawn From Service
Class 700
700
100 MPH Free 6 coaches Stepford Town (Stepford Central)-Port Benton Siemens Mobility/Desiro City November 25, 2017 April 21, 2018

Class 387

Class 387 Connect Train (December 4, 2017)
110 MPH 45 Robux 4 coaches All routes Bombardier Transportation/Electrostar December 4, 2017 December 18, 2017 (Moved to Waterline on December 21, 2017, then AirLink on June 8, 2019)

Future

  • None at the moment

Depots

Current

Former

Future

  • None at this time.

Sidings

Current

Stations

Current

Former

Future

  • None at this time.

Trivia

  • This operator has the most fleet and stations.
  • This is the only operator in SCR that no trains can run on all routes.
  • Most of the stations were originally meant to be on the closed operator: Metro.
  • This is the oldest operator in SCR.
  • Only two trains are Paper Trains: the Class 333 and the Class 380.
  • This Operator haves the most Depots and Spawning Locations.

Routes

Click here