Stepford County Railway Wiki

The Stepford County Railway Wiki has announced a new revamp project, giving the community a new way to give feedback for the project's future. You can read more here and participate on our Discord server.

READ MORE

Stepford County Railway Wiki
Tag: Visual edit
(Undo revision 21962 by Pcmaster675 (talk))
(27 intermediate revisions by 11 users not shown)
Line 1: Line 1:
  +
  +
== Overview ==
 
{{Line|Logo
 
{{Line|Logo
 
Stepford Connect Map.png
 
Stepford Connect Map.png
Line 9: Line 11:
 
|stops: = 33
 
|stops: = 33
 
|minimum_price: = Free
 
|minimum_price: = Free
  +
|rolling_stock: =
 
|start_station: = [[Stepford Victoria]]
 
|start_station: = [[Stepford Victoria]]
  +
[[Stepford Central]]
|end_station: = [[Whitefield]]
 
   
  +
[[St Helen's Bridge]]
[[Morganstown]]
 
 
|end_station: = [[Airport Central]]
   
 
[[Port Benton]]
 
[[Port Benton]]
   
[[Stepford Airport Central]]
+
[[Leighton Stepford Road]]
   
 
[[Edgemead]]
 
[[Edgemead]]
}}'''Stepford Connect''', more commonly known as just '''Connect''', serves as the main operator for rail service across the Stepford County Railway network.
 
   
 
[[Morganstown]]
[[Stepford Connect Headquarters]] is situated between [[Stepford East]] and [[Stepford Central]].
 
  +
  +
[[Berrily]]
  +
  +
[[Whitefield]]
  +
  +
[[Stepford United Football Club]]
 
}}'''Stepford Connect''', more commonly known as just '''Connect''', serves as the main operator for rail service across the Stepford County Railway network.
  +
 
Stepford Connect Headquarters is situated between [[Stepford East]] and [[Stepford Central]].
   
'''[[WaterLine]]''' is a subsidiary of Stepford Connect, and as such you can find Connect signage and branding used on trains and at stations operated by [[WaterLine]].
+
'''WaterLine''' is a subsidiary of Stepford Connect, and as such you can find Connect signage and branding used on trains and at stations operated by WaterLine.
   
 
== History of Stepford Connect ==
 
== History of Stepford Connect ==
   
 
=== '''2017''' ===
 
=== '''2017''' ===
Stepford Connect was the first operator that opened for [[The Network|Stepford County Railway]] entering service on November 25th of 2017, and was the regional rail operator for Stepford County as well. The first train to operate on the line was the [[Class 700]]. The first phase of the line opened with its termini at Stepford Town (later renamed [[Stepford Central]]) and [[Benton]], then was later extended to [[Stepford Airport Central]], forming an airport rail link between the city and the airport. Around the same time, a new station was opened: [[Port Benton]], which was the first non-mainline station on the network. The station was also the first to feature a terminus loop, in this case, it went back to Benton. Later, the new [[Coxly Depot]] was opened to alleviate traffic from the overcrowded [[Benton Depot]], along with the addition of the [[Class 333]] units to further improve the frequency of services on the line. The addition of the new [[Class 321]] units followed shortly after on the 29th, and the opening of the new extension of the Stepford Connect mainline to [[Winstree]] ([[Leighton Stepford Road]]) accompanied the release of the Class 321. Around December, many stations on the line, namely [[Bodin]], [[Benton Bridge]], [[Stepford Airport Parkway]] and [[Stepford Airport Central]] were renovated for larger capacity due to more travelling passengers on the line. A renovation to [[Benton]] followed shortly after. On December 4, two new trains entered the fleet: the [[Class 357]] and [[Class 387]], which were the first Electrostar trains in the history of SCR. The new [[Class 350]] entered service shortly after on December 6. On December 11 the Class 700 got fitted with a special livery to celebrate christmas and the [[Class 185]] entered service on the 13th. The Class 387 got transferred to WaterLine and was then replaced by the [[Class 377]] on December 21.
+
Stepford Connect was the first operator for SCR, entering service on November 25th of 2017. The first trains to operate its services were the [[Class 700]]s. Services began between Stepford Town (later renamed [[Stepford Central]]) and [[Benton]], then were later extended to [[Stepford Airport Central]], forming an airport rail link between the city and the airport. Around the same time [[Port Benton]] opened, which was the first non-mainline station on the network. The station was also the first to feature a terminus loop. Later, the new [[Coxly Depot]] was opened to alleviate traffic from the overcrowded [[Benton Depot]], along with the addition of the [[Class 333]] units to further improve the frequency of services. The addition of the new [[Class 321]] units followed shortly after on the 29th, and so did the opening of the mainline to [[Winstree]] (spiritual successor [[Leighton Stepford Road]]). Around December, many stations on the line, namely [[Bodin]], [[Benton Bridge]], [[Stepford Airport Parkway]] and [[Stepford Airport Central]] were renovated for larger capacity due to an increase in passenger traffic. A renovation to [[Benton]] followed shortly after. On December 4th, two new train types entered the fleet: the [[Class 357]] and [[Class 387]], which were the first Electrostar trains in the history of SCR. The new [[Class 350]]s entered service shortly after on December 6. On December 11th, some Class 700s were fitted with a special livery to celebrate Christmas and the [[Class 185]]s entered service on the 13th. On the 21st, the Class 387 units were taken out of service in favor of [[Class 377]] units.
   
 
=== '''2018''' ===
 
=== '''2018''' ===
A new train entered service on the stroke of midnight on January 1: the [[Class 170]]. The [[Class 720]] followed the release of the brand-new train, and it was the first Aventra train in the fleet. Benton then again got a renovation on January 9 to its present-day look. On April 21, the entire network of SCR got a revamp, which of course made a major impact on Stepford Connect, including the scrapping of the [[Class 700]] units, which were replaced by the [[Class 707]], and many stations also got renovations, such as [[Winstree]], which was renamed to [[Leighton Stepford Road]], and a bunch of new stations were introduced such as [[Rocket Parade]]. On August 4, a new train was announced for the fleet: the [[Class 365]], which currently has not entered service as of writing. Stepford Connect did not receive any changes until December 31, where the [[Morganstown]] and [[Edgemead]] extensions were opened and a new train was put into service: the [[Class 68]], which is the only locomotive-hauled train in SCR.
+
New trains entered service on the stroke of midnight on January 1st: the [[Class 170]]s. The [[Class 720]]s followed, and were the first Aventra trains. Benton got another renovation on January 9th to its present-day look. On April 21st, SCR got a complete revamp with [[The Big Update|V1.0]], which had a major impact on Stepford Connect, including the scrapping of the [[Class 700]] units, which were replaced by the [[Class 707]]s, and many station renovations or replacements, such as [[Leighton Stepford Road]] which replaced Winstree, and other stations such as [[Rocket Parade]] opened. On August 4th, a new train class was announced for the fleet: the [[Class 365]], which has still not entered service. Stepford Connect did not receive any changes until December 31st, where the [[Morganstown]] and [[Edgemead]] extensions were opened, and [[Class 68]] units were introduced.
   
 
=== '''2019''' ===
 
=== '''2019''' ===
The line was locked off from any modifications until April 28, where a new extension to [[Whitefield]] opened to the public. Then on May 6, a new train was added to celebrate the 3 millionth visitor of SCR: the [[Class 331]], which was released in /3 and /4 variants. On May 14, a new train entered service: the [[Class 158]], the first train to be fitted with [[Next Generation]] (train interior and working doors) technology. On May 29, a Next Generation replacement for the [[Class 185]] was rolled out, and on June 8 the [[Class 377]] was refurbished with Next Generation technology. On July 5, the [[Class 350]] and [[Class 357|357]] got refurbished with Next Generation technology. On July 9, a new train was added: the [[Class 458]]/5. The [[Class 68]] then got upgraded to Next Generation technology on August 7. On August 14, the /0 variant of the Class 458 was put into service. Then on August 31, the [[Class 170]] was upgraded to Next Generation. On September 22nd, a sneak-peek from SCR's official Discord server confirmed the upcoming Llyn extension which will pass through Westercoast as shown from the sneak-peek, with new scenery designed by thehazad9, the SCR [[People Director]]. New stations were revealed over time that were going to be placed on the extension, namely [[Faymere]] and [[Northshore]]. A fourth station, [[Starryloch]], was revealed on October 16. The terminus of the extension was revealed on October 18, which was called [[Llyn-by-the-Sea]] and also revealed the [[Class 43]] for the upcoming [[Stepford Express]] line.
+
Things remained the same for Stepford Connect until April 28th, when a new extension to [[Whitefield]] opened to much success. Then on May 6th, the [[Class 331]]s were introduced. On May 14th, the [[Class 158]]s entered service, the first [[Next Generation]] units for the operator. On May 29th, the [[Class 185]]s were upgraded to Next Generation, and on June 8, the [[Class 377]]s were upgraded. On July 5, the [[Class 350]]s and [[Class 357|357s]] recieved their NG upgrades. On July 9, the [[Class 458/5]]s were introduced. The [[Class 68]]s were then upgraded on August 7th. On August 14th, the Class 458/0s were put into service. On August 31, the [[Class 170]]s were upgraded. On September 22nd, a sneak-peek from SCR's official Discord server confirmed the upcoming extension which will pass through Westercoast, with new scenery designed by thehazad9, the [[People Director]]. New stations were revealed over time that were going to be on the extension, namely [[Faymere]] and [[Northshore]]. A fourth station, [[Starryloch]], was revealed on October 16th. The terminus of the extension was revealed on October 18th - [[Llyn-by-the-Sea]].
   
 
== Rolling Stock ==
 
== Rolling Stock ==
Line 46: Line 58:
 
!Number of Coaches
 
!Number of Coaches
 
!Routes Operated On
 
!Routes Operated On
!Train Family
+
!Train Family/Manufacturer
 
!Date Put Into Service
 
!Date Put Into Service
 
|-
 
|-
Line 56: Line 68:
 
|2 or 3 coaches
 
|2 or 3 coaches
 
|All routes excluding [[R009]]
 
|All routes excluding [[R009]]
|''[[:Category:Sprinter|Sprinter]]''
+
|''British Rail Engineering Limited/Sprinter''
 
|May 14, 2019
 
|May 14, 2019
 
|-
 
|-
Line 65: Line 77:
 
|3 coaches
 
|3 coaches
 
|All routes excluding [[R009]]
 
|All routes excluding [[R009]]
  +
|Adtranz/Bombardier Transportation/Turbostar
|''[[:Category:Turbostar|Turbostar]]''
 
 
|January 1, 2018 (Next Generation- August 31, 2019)
 
|January 1, 2018 (Next Generation- August 31, 2019)
 
|-
 
|-
Line 75: Line 87:
 
|All routes
 
|All routes
 
excluding [[R009]]
 
excluding [[R009]]
  +
|Siemens Mobility/Desiro
|''[[:Category:Desiro|Desiro]]''
 
 
|December 13, 2017
 
|December 13, 2017
 
(Next Generation- May 29, 2019)
 
(Next Generation- May 29, 2019)
 
|-
 
|-
 
|[[Class 321|'''Class 321''']]
 
|[[Class 321|'''Class 321''']]
Soon NG [[File:321-0.PNG|thumb|left|136px]]
+
[[Next Generation]] in progress [[File:321-0.PNG|thumb|left|136px]]
 
|100 MPH
 
|100 MPH
 
|1500 Points
 
|1500 Points
 
|4 coaches
 
|4 coaches
 
|All routes excluding [[R009]]
 
|All routes excluding [[R009]]
  +
|''British Rail Engineering Limited/BR Second Gen (Mark 3)''
|[https://scr.fandom.com/wiki/Category:Mark_3 ''Mark'' ''3'']
 
 
|November 29, 2017
 
|November 29, 2017
 
|-
 
|-
Line 94: Line 106:
 
|3 or 4 coaches
 
|3 or 4 coaches
 
|All routes excluding [[R009]]
 
|All routes excluding [[R009]]
|''[[:Category:Civity|Civity]]''
+
|''CAF/Civity''
 
|May 6, 2019
 
|May 6, 2019
 
|-
 
|-
Line 104: Line 116:
 
|All routes excluding [[R009]]
 
|All routes excluding [[R009]]
 
|
 
|
  +
''Siemens Mobility and CAF''
''[https://scr.fandom.com/wiki/Category:CAF CAF]''
 
|Around November 2017
+
|November 30, 2017
 
|-
 
|-
 
|'''[[Class 350]] (Next-Gen)'''
 
|'''[[Class 350]] (Next-Gen)'''
Line 113: Line 125:
 
|4 coaches
 
|4 coaches
 
|All routes excluding [[R009]]
 
|All routes excluding [[R009]]
|''[[:Category:Desiro City|Desiro]]''
+
|''Siemens Mobility/Desiro''
 
|December 6, 2017 (Next Generation-July 5, 2019)
 
|December 6, 2017 (Next Generation-July 5, 2019)
 
|-
 
|-
Line 122: Line 134:
 
|4 coaches
 
|4 coaches
 
|All routes excluding [[R009]]
 
|All routes excluding [[R009]]
|''[[:Category:Electrostar|Electrostar]]''
+
|''Adtranz/Bombardier Transportation/Electrostar''
 
|December 4, 2017 (Next Generation-July 5, 2019)
 
|December 4, 2017 (Next Generation-July 5, 2019)
 
|-
 
|-
Line 131: Line 143:
 
|4 coaches
 
|4 coaches
 
|All routes excluding [[R009]]
 
|All routes excluding [[R009]]
|''[[:Category:Electrostar|Electrostar]]''
+
|Bombardier Transportation/Electrostar
 
|December 18, 2017 (Next Generation- June 8, 2019)
 
|December 18, 2017 (Next Generation- June 8, 2019)
 
|-
 
|-
Line 140: Line 152:
 
|3 or 4 coaches
 
|3 or 4 coaches
 
|All routes excluding [[R009]]
 
|All routes excluding [[R009]]
  +
|Siemens Mobility/Desiro
|''[[:Category:Desiro City|Desiro]]''
 
 
|May 11, 2018
 
|May 11, 2018
 
|-
 
|-
Line 148: Line 160:
 
/0- 100MPH
 
/0- 100MPH
 
|1500 Points
 
|1500 Points
  +
|
|4/5 coaches
+
4 or 5 coaches
 
|All routes excluding [[R009]]
 
|All routes excluding [[R009]]
|''[[:Category:Juniper|Juniper]]''
+
|''Alstom/Juniper''
  +
|
|July 29, 2019
+
/5 - July 29, 2019
  +
  +
/0 - August 14, 2019
 
|-
 
|-
 
|[[Class 465|'''Class 465''']]
 
|[[Class 465|'''Class 465''']]
Line 159: Line 175:
 
|4 coaches
 
|4 coaches
 
|All routes excluding [[R009]]
 
|All routes excluding [[R009]]
  +
|''British Rail Engineering Limited/AB Rail/Metro-Cammell/Networker''
|''[[:Category:Networker|Networkers]]''
 
|November 2017
+
|November 30, 2017
 
|-
 
|-
 
|'''[[Class 707]] (Next-Gen)'''
 
|'''[[Class 707]] (Next-Gen)'''
Line 168: Line 184:
 
|5 coaches
 
|5 coaches
 
|All routes excluding [[R009]]
 
|All routes excluding [[R009]]
|''[[:Category:Desiro City|Desiro City]]''
+
|''Siemens Mobility/Desiro City''
 
|April 21, 2018 (Next Generation- July 20, 2019)
 
|April 21, 2018 (Next Generation- July 20, 2019)
 
|-
 
|-
Line 177: Line 193:
 
|5 coaches
 
|5 coaches
 
|All routes excluding [[R009]]
 
|All routes excluding [[R009]]
|''[[:Category:Aventra|Aventra]]''
+
|''Bombardier Transportation/Aventra''
|Around January 2018
+
|January 29, 2018
 
|-
 
|-
 
|'''[[Class 68]] (Next-Gen)'''
 
|'''[[Class 68]] (Next-Gen)'''
Line 188: Line 204:
   
 
and 200 Experience
 
and 200 Experience
|3 with 2 locomotives, making it 5 cars
+
|2 locomotives, 3 coaches, making it 5 coaches
 
|R003, R004,
 
|R003, R004,
 
R006, R007, [[R009]],
 
R006, R007, [[R009]],
 
R022
 
R022
|''[[:Category: Eurolight|Eurolight]]''
+
|''Stadler Rail/Eurolight''
 
|December 31, 2018 (Next Generation-August 8th 2019)
 
|December 31, 2018 (Next Generation-August 8th 2019)
 
|}
 
|}
Line 203: Line 219:
 
!Number of Coaches
 
!Number of Coaches
 
!Routes Operated On
 
!Routes Operated On
!Train Family
+
!Train Family/Manufacturer
 
!Date Put Into Service
 
!Date Put Into Service
 
!Date Withdrawn From Service
 
!Date Withdrawn From Service
Line 213: Line 229:
 
|6 coaches
 
|6 coaches
 
|Stepford Town ([[Stepford Central]])-[[Port Benton]]
 
|Stepford Town ([[Stepford Central]])-[[Port Benton]]
|''[[:Category: Desiro City|Desiro City]]''
+
|Siemens Mobility/Desiro City
 
|November 25, 2017
 
|November 25, 2017
|April 20, 2018
+
|April 21, 2018
 
|-
 
|-
 
|
 
|
Line 225: Line 241:
 
|4 coaches
 
|4 coaches
 
|All routes
 
|All routes
  +
|''Bombardier Transportation/Electrostar''
|''[https://stepfordcountyrailway.fandom.com/wiki/Category:Electrostar Electrostar]''
 
 
|December 4, 2017
 
|December 4, 2017
 
|December 18, 2017 (Moved to [[Waterline]] on December 21, 2017, then [[AirLink]] on June 8, 2019)
 
|December 18, 2017 (Moved to [[Waterline]] on December 21, 2017, then [[AirLink]] on June 8, 2019)
Line 246: Line 262:
 
* [[Bodin Depot]]
 
* [[Bodin Depot]]
 
* [[Winstree Depot]]
 
* [[Winstree Depot]]
  +
  +
=== Future ===
  +
* None at the moment
   
 
== Sidings ==
 
== Sidings ==
Line 296: Line 315:
 
* [[Faymere]]
 
* [[Faymere]]
 
* [[Westercoast]]
 
* [[Westercoast]]
  +
* [[Millcastle Racecourse]]
 
* [[Starryloch]]
 
* [[Starryloch]]
 
* [[Northshore]]
 
* [[Northshore]]

Revision as of 19:25, 15 December 2019

Overview

Template:LineStepford Connect, more commonly known as just Connect, serves as the main operator for rail service across the Stepford County Railway network.

Stepford Connect Headquarters is situated between Stepford East and Stepford Central.

WaterLine is a subsidiary of Stepford Connect, and as such you can find Connect signage and branding used on trains and at stations operated by WaterLine.

History of Stepford Connect

2017

Stepford Connect was the first operator for SCR, entering service on November 25th of 2017. The first trains to operate its services were the Class 700s. Services began between Stepford Town (later renamed Stepford Central) and Benton, then were later extended to Stepford Airport Central, forming an airport rail link between the city and the airport. Around the same time Port Benton opened, which was the first non-mainline station on the network. The station was also the first to feature a terminus loop. Later, the new Coxly Depot was opened to alleviate traffic from the overcrowded Benton Depot, along with the addition of the Class 333 units to further improve the frequency of services. The addition of the new Class 321 units followed shortly after on the 29th, and so did the opening of the mainline to Winstree (spiritual successor Leighton Stepford Road). Around December, many stations on the line, namely BodinBenton BridgeStepford Airport Parkway and Stepford Airport Central were renovated for larger capacity due to an increase in passenger traffic. A renovation to Benton followed shortly after. On December 4th, two new train types entered the fleet: the Class 357 and Class 387, which were the first Electrostar trains in the history of SCR. The new Class 350s entered service shortly after on December 6. On December 11th, some Class 700s were fitted with a special livery to celebrate Christmas and the Class 185s entered service on the 13th. On the 21st, the Class 387 units were taken out of service in favor of Class 377 units.

2018

New trains entered service on the stroke of midnight on January 1st: the Class 170s. The Class 720s followed, and were the first Aventra trains. Benton got another renovation on January 9th to its present-day look. On April 21st, SCR got a complete revamp with V1.0, which had a major impact on Stepford Connect, including the scrapping of the Class 700 units, which were replaced by the Class 707s, and many station renovations or replacements, such as Leighton Stepford Road which replaced Winstree, and other stations such as Rocket Parade opened. On August 4th, a new train class was announced for the fleet: the Class 365, which has still not entered service. Stepford Connect did not receive any changes until December 31st, where the Morganstown and Edgemead extensions were opened, and Class 68 units were introduced.

2019

Things remained the same for Stepford Connect until April 28th, when a new extension to Whitefield opened to much success. Then on May 6th, the Class 331s were introduced. On May 14th, the Class 158s entered service, the first Next Generation units for the operator. On May 29th, the Class 185s were upgraded to Next Generation, and on June 8, the Class 377s were upgraded. On July 5, the Class 350s and 357s recieved their NG upgrades. On July 9, the Class 458/5s were introduced. The Class 68s were then upgraded on August 7th. On August 14th, the Class 458/0s were put into service. On August 31, the Class 170s were upgraded. On September 22nd, a sneak-peek from SCR's official Discord server confirmed the upcoming extension which will pass through Westercoast, with new scenery designed by thehazad9, the People Director. New stations were revealed over time that were going to be on the extension, namely Faymere and Northshore. A fourth station, Starryloch, was revealed on October 16th. The terminus of the extension was revealed on October 18th - Llyn-by-the-Sea.

Rolling Stock

The following chart shows the current, past, and future fleet of Stepford Connect.

Current Fleet

Class Number Maximum Speed Price Number of Coaches Routes Operated On Train Family/Manufacturer Date Put Into Service
Class 158

(Next-Gen)

158 158911
90 MPH 1500 Points 2 or 3 coaches All routes excluding R009 British Rail Engineering Limited/Sprinter May 14, 2019
Class 170 (Next-Gen)
RobloxScreenShot20190902 142152243 (2)
100 MPH 1500 Points 3 coaches All routes excluding R009 Adtranz/Bombardier Transportation/Turbostar January 1, 2018 (Next Generation- August 31, 2019)
Class 185 (Next-Gen)
185Edge
100 MPH 1500 Points 3 Coaches All routes

excluding R009

Siemens Mobility/Desiro December 13, 2017

(Next Generation- May 29, 2019)

Class 321 Next Generation in progress
321-0
100 MPH 1500 Points 4 coaches All routes excluding R009 British Rail Engineering Limited/BR Second Gen (Mark 3) November 29, 2017
Class 331
331108
100 MPH 1500 Points 3 or 4 coaches All routes excluding R009 CAF/Civity May 6, 2019
Class 333
333 Connect
100 MPH 1500 Points 4 coaches All routes excluding R009

Siemens Mobility and CAF

November 30, 2017
Class 350 (Next-Gen)
350361
110 MPH 1500 Points 4 coaches All routes excluding R009 Siemens Mobility/Desiro December 6, 2017 (Next Generation-July 5, 2019)
Class 357 (Next-Gen)
357066
100 MPH Free 4 coaches All routes excluding R009 Adtranz/Bombardier Transportation/Electrostar December 4, 2017 (Next Generation-July 5, 2019)
Class 377 (Next-Gen)
377280
100 MPH 1500 Points 4 coaches All routes excluding R009 Bombardier Transportation/Electrostar December 18, 2017 (Next Generation- June 8, 2019)
Class 380
Roblox 12 19 2018 10 46 36 PM
100 MPH 1500 Points 3 or 4 coaches All routes excluding R009 Siemens Mobility/Desiro May 11, 2018
Class 458 (Next Gen)
Class 458s
/5 - 75MPH

/0- 100MPH

1500 Points

4 or 5 coaches

All routes excluding R009 Alstom/Juniper

/5 - July 29, 2019

/0 - August 14, 2019

Class 465
Class465
75 MPH 1500 Points 4 coaches All routes excluding R009 British Rail Engineering Limited/AB Rail/Metro-Cammell/Networker November 30, 2017
Class 707 (Next-Gen)
707042
100 MPH 300 Points 5 coaches All routes excluding R009 Siemens Mobility/Desiro City April 21, 2018 (Next Generation- July 20, 2019)
Class 720
720 connect
100 MPH 1500 Points 5 coaches All routes excluding R009 Bombardier Transportation/Aventra January 29, 2018
Class 68 (Next-Gen)
68edge
100 MPH 3000

Points

and 200 Experience

2 locomotives, 3 coaches, making it 5 coaches R003, R004,

R006, R007, R009, R022

Stadler Rail/Eurolight December 31, 2018 (Next Generation-August 8th 2019)

Former

Class Number Maximum Speed Price Number of Coaches Routes Operated On Train Family/Manufacturer Date Put Into Service Date Withdrawn From Service
Class 700
700
100 MPH Free 6 coaches Stepford Town (Stepford Central)-Port Benton Siemens Mobility/Desiro City November 25, 2017 April 21, 2018

Class 387

Class 387 Connect Train (December 4, 2017)
110 MPH 45 Robux 4 coaches All routes Bombardier Transportation/Electrostar December 4, 2017 December 18, 2017 (Moved to Waterline on December 21, 2017, then AirLink on June 8, 2019)

Future

  • None at the moment

Depots

Current

Former

Future

  • None at the moment

Sidings

Current

Stations

Current

Former

Future

Routes

It takes up a whole page over here, so a page has been created for it.

[Link is here]