The Stepford County Railway Wiki has announced a new revamp project, giving the community a new way to give feedback for the project's future. You can read more here and participate on our Discord server.
In V1.10, its usage has increased again, with three new routes stopping at the station.[1]
Before V1.1, it was the only Waterline station that had platforms not in use.
The station became dispatchable in V1.3.21, although it is unlikely that this would encourage dispatchers to dispatch due to players rarely driving Waterline.
Cambridge Street Parkway and Airport West used to be the only stations on Waterline with a travel time of 2 minutes between them, but when the Morganstown Shuttle was released, Morganstown Docks and Morganstown also have a time of 2 minutes between them. The rest only have <1 minute.
Though in V1.9, timings between Waterline stations have increased due to complaints and the Newry branch upgrade.
Cambridge Street Parkway has the second longest station name in-game at 24 characters, with the longest being Stepford United Football Club with 29, and the third longest being Leighton Stepford Road with 22.
The name of this station is so long that on the Driver HUD, 'Parkway' is cut off.
Ironically, there was once a sign in the ticket hall says "Frequent services to Benton from Platforms 2 and 4", when players seldom drive Waterline. It has been removed in V1.8.
From V1.8 to V1.9, this station had the most parking spaces, at 234.
Prior to V1.8, many players considered the station as one of the worst, due to the bare colour scheme and lack of scenery nearby, and hoped that there would be an improvement or rebuild of the station in future.
Eventually, former Managing Director Charlie_RBX previewed this station rebuilt on the 23rd of October 2021, evident of the station sign.
The billboard in the background is a reference to rock band Oasis.
After the station's overhaul in V1.8, access to the platform was replaced with ramps instead of stairs, making this station having step-free access.
Prior to V1.8, this station had two platforms each for eastbound and westbound services (1 & 3 for Eastbound, 2 & 4 for Westbound). Platform 1 and 2 was for services to and from Connolly, and Platform 3 and 4 for services to and from James Street.
After the overhaul in V1.8, Platform 4 was demolished. Platform 2 was converted into a westbound platform, leaving only 1 platform for eastbound services. There are also no longer separate platforms for services to Connolly and services via Airport West.
The abandoned structure of Platform 4 and its track beds can still be seen in the station.