Stepford County Railway Wiki

The Stepford County Railway Wiki has announced a new revamp project, giving the community a new way to give feedback for the project's future. You can read more here and participate on our Discord server.

READ MORE

Stepford County Railway Wiki
No edit summary
Tag: Visual edit
Tag: Visual edit
Line 8: Line 8:
 
* This train went on a series of test runs from September 12-15, 2018. The tests were a success, but it is unknown why it was never released. A possible reason is that a 7 car train might have been too laggy and a speed of 90 MPH would have been too slow for the [[AirLink]] line. Since the change of chassis and the release of [[Next Generation]] trains, this train would have to go through a major overhaul before going into service and would also have to be lengthened form 7 coaches to 9 coaches.
 
* This train went on a series of test runs from September 12-15, 2018. The tests were a success, but it is unknown why it was never released. A possible reason is that a 7 car train might have been too laggy and a speed of 90 MPH would have been too slow for the [[AirLink]] line. Since the change of chassis and the release of [[Next Generation]] trains, this train would have to go through a major overhaul before going into service and would also have to be lengthened form 7 coaches to 9 coaches.
 
* The train was first revealed in the SCR Discord in #announcements. The photo in the sneak peek is shown on the right.
 
* The train was first revealed in the SCR Discord in #announcements. The photo in the sneak peek is shown on the right.
* If it had been released, this train would have been the longest train on the network, with a total of 7 coaches.
+
* If it had been released, this train would have been the longest train on the network, with a total of 7 or 9 coaches.
* These trains are the only known trains with three doors on one side of a coach.
+
* These trains are the only trains with three doors on one side of a coach.
 
* In real life these trains are operated on TfL Rail, a precursor to Crossrail.
 
* In real life these trains are operated on TfL Rail, a precursor to Crossrail.
 
* This was the first and only train in SCR train that was used for testing.
 
* This was the first and only train in SCR train that was used for testing.

Revision as of 00:42, 14 March 2020

Template:Removed Template:Train

Overview

The Class 345 Aventra trains were used for testing on AirLink. These trains were 7 cars in length, with a maximum speed of 90 MPH. These trains were never put into regular service, and they were withdrawn from testing without any further announcements regarding these units.

Trivia

  • This train went on a series of test runs from September 12-15, 2018. The tests were a success, but it is unknown why it was never released. A possible reason is that a 7 car train might have been too laggy and a speed of 90 MPH would have been too slow for the AirLink line. Since the change of chassis and the release of Next Generation trains, this train would have to go through a major overhaul before going into service and would also have to be lengthened form 7 coaches to 9 coaches.
  • The train was first revealed in the SCR Discord in #announcements. The photo in the sneak peek is shown on the right.
  • If it had been released, this train would have been the longest train on the network, with a total of 7 or 9 coaches.
  • These trains are the only trains with three doors on one side of a coach.
  • In real life these trains are operated on TfL Rail, a precursor to Crossrail.
  • This was the first and only train in SCR train that was used for testing.
  • If this train was put in service, it would have been the slowest AirLink train.