Stepford County Railway Wiki

The Stepford County Railway Wiki has announced a new revamp project, giving the community a new way to give feedback for the project's future. You can read more here and participate on our Discord server.

READ MORE

Stepford County Railway Wiki
Tag: Visual edit
No edit summary
Tag: Visual edit
Line 1: Line 1:
 
{{RESTRICTEDAREA|location = Benton|main_use = |minimum_rank = Open the the public|image1 = Roblox 9 23 2018 8 07 21 AM.png|title1 = Benton Rail Operations Centre}}
 
{{RESTRICTEDAREA|location = Benton|main_use = |minimum_rank = Open the the public|image1 = Roblox 9 23 2018 8 07 21 AM.png|title1 = Benton Rail Operations Centre}}
The '''Benton Rail Operations Centre '''(affectionately known as the ROC) was a building that was used to control the signals around the network. As of [[SCR Version 1.1]] the building is now defunct, as the Signalling ROC was moved to [[Stepford East]].
+
The '''Benton Rail Operations Centre '''(affectionately known as the Benton ROC) was a building that was used to control the signals around the network. As of [[SCR Version 1.1]] the building is now defunct, as the Signalling ROC was moved to [[Stepford East]].
 
==History==
 
==History==
*The Benton ROC was added back in December of 2017, along with the upgraded [[Benton]] and [[Angel Pass|Angel]] [[Angel Pass|Pass]].
+
*The Benton ROC was added back in December of 2017, along with the upgraded [[Benton]] and [[Angel Pass|Angel]] [[Angel Pass|Pass]].
 
*Back then, most of the floors were empty, except for the display of the front car of the [[Class 700]] on the first floor.
 
*Back then, most of the floors were empty, except for the display of the front car of the [[Class 700]] on the first floor.
 
*In [[The Big Update]], the signalling room was added, making this the place were the signallers signal the whole network at.
 
*In [[The Big Update]], the signalling room was added, making this the place were the signallers signal the whole network at.
Line 10: Line 10:
 
{| class="article-table"
 
{| class="article-table"
 
|First Floor
 
|First Floor
|Entrance with barriers; No longer restricted
+
|Entrance with barriers; no longer restricted
 
|-
 
|-
 
|Second Floor
 
|Second Floor

Revision as of 12:30, 4 March 2019

Template:RESTRICTEDAREA The Benton Rail Operations Centre (affectionately known as the Benton ROC) was a building that was used to control the signals around the network. As of SCR Version 1.1 the building is now defunct, as the Signalling ROC was moved to Stepford East.

History

  • The Benton ROC was added back in December of 2017, along with the upgraded Benton and Angel Pass.
  • Back then, most of the floors were empty, except for the display of the front car of the Class 700 on the first floor.
  • In The Big Update, the signalling room was added, making this the place were the signallers signal the whole network at.
  • In Ver 1.1, they removed the Class 700, the equipment in the signalling room and allowed everyone to go through the barriers on the first floor.
    File:Roblox 9 23 2018 8 11 38 AM.png

    The Class 700 seen from the outside

Floor Layout

First Floor Entrance with barriers; no longer restricted
Second Floor Empty signal control room with no equipment and some empty rooms; Nobody can enter
Third Floor Charlie_RBX, Thehazard9, and BanTech's offices

Uses

  • This was the place where the Signallers do their signalling at. The old signalling room was at Coxly, but after V1.1 The control room got moved again to Stepford East Rail Operations Centre.
  • The entrance of the building was used as a gathering place for attendants of Dispatcher trainings and many other events. They were soon relocated to the Stepford East ROC.