FANDOM


(History)
Line 19: Line 19:
 
|}
 
|}
 
==Uses==
 
==Uses==
*This was the place where the Signallers do their signalling at. The old signalling room was at [[Coxly]], but after [[V1.1]] The control room will get moved again to [[Stepford East Rail Operations Centre]].
+
*This was the place where the Signallers do their signalling at. The old signalling room was at [[Coxly]], but after [[V1.1]] The control room got moved again to [[Stepford East Rail Operations Centre]].
 
*The entrance of the building is used as a gathering place for attendants of [[Dispatcher]] trainings and many other events.
 
*The entrance of the building is used as a gathering place for attendants of [[Dispatcher]] trainings and many other events.
 
*There was a model of a [[Class 700]] but as of December 31st, 2018 it is removed.
 
*There was a model of a [[Class 700]] but as of December 31st, 2018 it is removed.

Revision as of 03:56, January 3, 2019

The Benton Rail Operations Centre (affectionately known as the ROC) was a building that was used to control the signals around the network. On the 14th December 2018 it was announced that a new ROC has been built in Stepford East and would open in V1.1. As of SCR Version 1.1 the building is now defunct.

History

  • The Benton ROC was added back in December of 2017, along with the upgraded Benton and Angel Pass.
  • Back then, most of the floors were empty, except for the front car of the Class 700 on the first floor.
  • In The Big Update, the signalling room was added, making this the place were the signallers signal the whole network at.
  • In Ver 1.1, they removed the Class 700, the equiment in the signalling room and allowed everyone to go through the barriers on the first floor.
    File:Roblox 9 23 2018 8 11 38 AM.png

Floor Layout

First Floor Entrance with barriers
Second Floor Empty signal control room with no equipment and some empty rooms
Third Floor Charlie_RBX, Thehazard9, and BanTech's offices

Uses

  • This was the place where the Signallers do their signalling at. The old signalling room was at Coxly, but after V1.1 The control room got moved again to Stepford East Rail Operations Centre.
  • The entrance of the building is used as a gathering place for attendants of Dispatcher trainings and many other events.
  • There was a model of a Class 700 but as of December 31st, 2018 it is removed.
Community content is available under CC-BY-SA unless otherwise noted.