No edit summary Tag: Visual edit |
Tag: Visual edit |
||
Line 9: | Line 9: | ||
== Floor Layout == |
== Floor Layout == |
||
+ | {| class="article-table" |
||
⚫ | |||
+ | |First Floor |
||
− | *Middle Floor: Signalling Room, empty space |
||
+ | |Entrance with barriers and the front carriage of the Class 700 |
||
− | *Upper Floor: Executive Offices, empty space |
||
+ | |- |
||
+ | |Second Floor |
||
+ | |Signal control room and some empty rooms |
||
+ | |- |
||
+ | |Third Floor |
||
+ | |Charlie_RBX, Thehazard9, and BanTech's offices |
||
+ | |} |
||
⚫ | |||
==Uses== |
==Uses== |
||
*This is the place where the Signallers do their signalling at. The old signalling room was in Coxly Station. |
*This is the place where the Signallers do their signalling at. The old signalling room was in Coxly Station. |
Revision as of 10:16, 14 October 2018
The Benton Rail Operations Center (or Benton ROC) is a building that is used for holding Dispatcher trainings and to control the signals around the network.
Template:RESTRICTEDAREA
History
- The Benton ROC is a building that was added back in December, along with the upgraded Benton and Angel Pass.
- Back then, most of the floors were empty, except for the front car of the Class 700 on the first floor.
- In The Big Update, the signalling room was added, making this the place were the signallers signal the whole network at.
Floor Layout
First Floor | Entrance with barriers and the front carriage of the Class 700 |
Second Floor | Signal control room and some empty rooms |
Third Floor | Charlie_RBX, Thehazard9, and BanTech's offices |
Uses
- This is the place where the Signallers do their signalling at. The old signalling room was in Coxly Station.
- Dispatcher trainings also start here, from outside the building.
- Qualified Driver trainings used to start outside the building, like the Dispatcher Trainings, but now they start from outside Stepford Central.
- A model of a Class 700 (Not in use anymore) is in the building.